Footage: 27,000 sq. ft.
Date Completed:2004
Builders: Grindline (transition section) and Alltec Skateparks (street section)
Helmets: required
Pads: optional
Bikes: No.
Features:More info needed. Large bowl section, Funnel, lots of transition and street stuff.